Download the results from our long-term test at Burger King and see the results for yourself

Project data:

Period: 2020-09-01 – 2022-08-01 (22 months)

Site: Burger King, Bulltofta, Malmö

Operating hours: 16h/dygn

Air flow exhaust air: 1,02m3 /s

Air flow make-up air: 2,0m3 /s

Temperature exhaust air: 34°C 

Temperature set-point make-up air: 16°C

Lepido unit: L12-14.30