
Download the results from our long-term test at Burger King and see the results for yourself
Project data:
Period: 2020-09-01 – 2022-08-01 (22 months)
Site: Burger King, Bulltofta, Malmö
Operating hours: 16h/dygn
Air flow exhaust air: 1,02m3 /s
Air flow make-up air: 2,0m3 /s
Temperature exhaust air: 34°C
Temperature set-point make-up air: 16°C
Lepido unit: L12-14.30